
Permit to work on paper: a system designed to fail quietlyFollow one paper permit through a typical approval chain — the pad, the walk for signatures, the coloured copies, the board — and the failures stay quiet until the record is asked to prove who authorised what, when.22 Apr 2025 · Industry · Safety · 8 min read 
The principal designer's information duty that nobody resourcesCDM and the Building Safety Act name a principal designer who must assemble, coordinate and keep safety information current. The fee usually buys a name on the form. Here is how to tell the duty from the line that actually got budgeted.10 Apr 2025 · Industry · Safety · 10 min read 