Learning · Asset management and operations

All Learning
Connecting a CDE to a CMMS without a two-year integration projectThree practical joins already sit between a common data environment and a computerised maintenance system: a shared asset identifier, an export of the asset information model, and a scheduled sync. Each has a named failure mode. None of them is a two-year programme.2 Jun 2026 · Learning · Operations · 13 min read
Overhead documentary still of a grey steel facilities bench: a hole-punched CDE asset-information extract on the left, a yellow-pink CMMS work-order card on the right, one stamped stainless asset-ID tag overlapping both sheets, and a single unused black patch cable beside them; galvanised plant casing and a hook rack of blank tags in the background.